|
|
|
|
|
|
|
|
|
• |
For any
development to be possible along Train
|
|
|
Avenue, it would
be necessary to align the
|
|
|
viewpoints and
needs of both the residents and
|
|
|
business owners
|
|
|
• |
The idea of
opening up the stream and
|
|
|
|
building a
multi-purpose trail connecting to
|
|
|
the Towpath was
well received by
|
|
|
|
business owners
and residents alike
|
|